Perform a 3D ERI Survey with a fast inline 3D array (3D Electrical Resistivity Imaging)
Perform steps 1-11 of the 2D Survey outlined above and collect at least two parallel 2D survey lines.
Assume that the first data scan in steps 1-11 was produced starting at the (0,0) coordinate along the X-axis
Move the next 2D survey line one electrode spacing (ES) parallel to the first line and record the new starting coordinate. I.e. If the electrode spacing is 5 meter then the new location for the second line is (0,5)
Repeat steps 1-11 of the 2D Survey outlined above.
Repeat steps 1-11 by collecting 2 or more parallel 2D lines
Process the multiple parallel 2D lines using the AGI EarthImager 3D
Go to Tools -> Combine 2D Parallel Lines > enter Y offset distance for each line loaded > save files to a new "combined" dataset